Ledbury Estate

Ashstone MEP were responsible for the coordination and development of Contractor Design Package (CDP) submissions in support of the Gateway 2 approval process. The scope included detailed design coordination, final system integration, interface management, and the appointment and management of trusted specialist subcontractors to deliver detailed design input across life-safety, electrical, controls, and building services systems.


The coordinated design packages comprised electrical substation final coordination and integration; life-safety standby power systems including Automatic Transfer Switches (ATS) and final diesel generator selection; generator ventilation, controls, and system interfaces; noise assessment, calculations, and testing; controls strategy development including valve selection and authority; Building Management System (BMS) design and interfaces; telecommunications systems; fire detection and alarm systems including evacuation alert systems; security, access control, CCTV, and intruder alarm systems; solar photovoltaic (PV) system design and coordination; lift installations including passenger, goods, evacuation, and firefighting lifts; lightning protection systems; smoke ventilation systems; sprinkler systems including electrical supplies and controls wiring; and dry and wet riser systems. All BMS design was developed in full accordance with the London Borough of Southwark’s standard BMS and controls specification.


This scope reflects Ashstone MEP’s experience in managing complex, multi-discipline CDP coordination for high-risk buildings, ensuring regulatory compliance, coordinated system integration, and readiness for Gateway 2 approval.

Project Gallery

Contact Us

Navigation

Legal

Follow Us

  • Instagram
  • Facebook
  • LinkedIn

01622 433 330

1a Heathfield Road,

Penenden Heath,

Maidstone,

Kent

ME14 2AD

Ashstone MEP Ltd registered in England Wales: 12764492

© 2023 by Ashstone MEP Ltd. Powered and secured by Wix

bottom of page